Home Featured Bhopal: Remove Barricades From Areas Where Metro Work Completed Says MD

Bhopal: Remove Barricades From Areas Where Metro Work Completed Says MD

by rajtamil
0 comment 16 views

Bhopal (Madhya Pradesh): The managing director of Madhya Pradesh Metro Rail Corporation, S Krishna Chaitanya directed to remove the barricades at the earliest from the areas where metro work has been completed. The MD gave the directions during weekly inspection of Metro works.

Notably, owing to barricading at different places under the Metro Project, people are facing a lot of challenges in commuting as they have to take a long route to reach their destination. Clearing of barricades would ensure smooth traffic movement.

During inspection Chaitanya directed to complete the remaining work of civil and systems shortly. He also discussed the metro multi model transport connectivity and other metro facilities. He asked all contractors to work in tandem to ensure that work speed is not affected.

VIDEO: 3-Foot Long Cobra Spotted Hiding In Almirah At A House In Jabalpur; Panicked Residents Call Snake Catchers

He took updates on the administrative building, operation control centre, control theatre, telecom equipment room, 2 Inspection way, washing area, test track and other.

The MD also visited Bhopal Metro Priority Corridor between Subash Nagar station and Rani Kamlapati Metro Station. Later talking to Free Press, the MD said that most of the works are running as per schedule.

You may also like

2024 All Right Reserved.

Adblock Detected

Please support us by disabling your AdBlocker extension from your browsers for our website.